- 9/17: Refined requirements specification (3.4-3.9).
- 9/22: Scenarios (2.2).
- 9/17: Primary class list (3.10).
- 9/29: Class diagrams (3.10).
- 9/29: Use case descriptions and diagrams (3.10).
- 10/1: Structured walk-through (in class) (3.8).
- 10/6: Object diagrams (5.3).
- 10/6: Revised class diagrams (5.2, 5.3).
- 10/13: User interface mock-ups.
- 10/6: State machines (4.7).
- 10/13: Collaboration diagrams (5.3).
- 10/20: Sequence diagrams (5.3).
- 10/20: Object diagrams (5.3).
- 10/27: Refined class diagrams (5.2, 5.3).
- 10/27: Class skeletons (5.2).
- 10/29: Informal walk-through/design refinement (in class).
- 10/27: Implementation plan (7.4, 7.5).
- 11/22: Source code.
- 11/3: Test plan (8.4, 8.7).
- 11/29: Test analysis report (8.5).
- 12/8: System Integration (7.4).
- 12/10: Code Freeze (no more work permitted).
- Final: System delivery and demo.