Project Deliverables Schedule
Tom Kelliher, CS 245
Sept. 8, 2008
- 9/19: Refined requirements specification (3.4-3.9).
- 9/24: Scenarios (2.2).
- 9/19: Primary class list (3.10).
- 10/1: Class diagrams (3.10).
- 10/1: Use case descriptions and diagrams (3.10).
- 10/3: Structured walk-through (in class) (3.8).
- 10/8: Object diagrams (5.3).
- 10/8: Revised class diagrams (5.2, 5.3).
- 10/15: User interface mock-ups.
- 10/8: State machines (4.7).
- 10/15: Collaboration diagrams (5.3).
- 10/22: Sequence diagrams (5.3).
- 10/22: Object diagrams (5.3).
- 10/29: Refined class diagrams (5.2, 5.3).
- 10/29: Class skeletons (5.2).
- 10/31: Informal walk-through/design refinement (in class).
- 10/29: Implementation plan (7.4, 7.5).
- 11/24: Source code.
- 11/5: Test plan (8.4, 8.7).
- 12/1: Test analysis report (8.5).
- 12/10: System Integration (7.4).
- 12/12: Code Freeze (no more work permitted).
- Final: System delivery and demo.