Revised Project Deliverables Schedule
Tom Kelliher, CS 245
Oct. 1, 2006
- 9/15: Refined requirements specification (3.4-3.9).
- 9/20: Scenarios (2.2).
- 9/17: Primary class list (3.10).
- 9/27: Class diagrams (3.10).
- 9/27: Use case descriptions and diagrams (3.10).
- 9/29: Structured walk-through (in class) (3.8).
- 10/11: Object diagrams (5.3).
- 10/11: Revised class diagrams (5.2, 5.3).
- 10/18: User interface mock-ups.
- 10/11: State machines (4.7).
- 10/18: Collaboration diagrams (5.3).
- 10/25: Sequence diagrams (5.3).
- 10/25: Object diagrams (5.3).
- 11/1: Refined class diagrams (5.2, 5.3).
- 11/1: Class skeletons (5.2).
- 11/3: Informal walk-through/design refinement (in class).
- 11/1: Implementation plan (7.4, 7.5).
- 11/20: Source code.
- 11/8: Test plan (8.4, 8.7).
- 11/27: Test analysis report (8.5).
- 12/6: System Integration (7.4).
- 12/8: Code Freeze (no more work permitted).
- Final: System delivery and demo.